You plan conduits by first placing sockets, switches and boxes and then running a conduit from each box to the distribution board or the nearest junction box: in the floor on the raw slab, in the installation zones of the wall or at the ceiling. In RoomPlanning you see the zones after the German standard DIN 18015-3 in the floor plan and in the wall view, every conduit shows its cables, its fill and its bends, and hints point out conduits outside the zones or conduits that are too full. All figures here and in the editor are guideline values for orientation, not an engineering design.

How to plan conduits in RoomPlanning

  1. Boxes first. Place sockets, switches and lights with the Electrical tool (Planning circuits). Junction boxes, pull boxes, floor boxes, the multi-utility house entry or a roof cable entry are in the catalog under Electrical & services.
  2. Show the installation zones. Under layers, turn on Installation zones. The floor plan then shows the vertical zones at doors, windows and corners and the band at the ceiling; the wall view shows the horizontal zones as well.
  3. Pick the Conduit tool. Under Building services pick Conduit. In the Conduit panel you set the trade (for example power, data, PV or wallbox), size, conduit type and pull wire.
  4. Draw the conduits. Click from point to point, in the floor, in a wall zone or at the ceiling. The conduit snaps to sockets, switches and boxes.
  5. Check what is inside. The properties of a conduit show its cables, fill, number of bends and length. Suggest size picks a size that fits the cables you entered.
  6. Read the hints. Under Hints you find, for example, conduits outside the zones, a fill above 40 % or power and data in the same conduit. A click shows the spot on the plan.
  7. Check the structure. Give the walls their structure and whether they are load-bearing, doors and windows their lintel. The hints then check chases in load-bearing walls after DIN EN 1996-1-1/NA (tables NA.19 and NA.20), conduits through lintels, concrete, drywall, the heated screed and crossings with water pipes.
  8. Let it propose the network. Propose conduit network lays star-shaped conduits from the media enclosure to every network and TV socket, 2 × M32 between storeys, PV from the roof, wallbox and garden, in one step (Premium, free once per plan to try).
  9. Shell documents. Wall view and room elevation show every box with its distance from the corner and its height above the floor. The bill of materials gives metres, coils, boxes, cables, chases and core drills, as CSV or Excel. There are also the conduit plan per storey, labels for both ends of every conduit and the sheet set "Shell electrics" (Premium). Which size a conduit needs is worked out by the conduit size calculator.
The ground floor in the editor with the installation zones shown: light blue bands along the walls, at doors and windows, plus sockets, switches and lights.
The Installation zones layer shows where cables and conduits may run in the walls.

The step-by-step guide is in the help under Plan conduits, Installation zones and Conduit plan and bill of materials. Where each box goes is explained in the guide Creating an electrical plan.

To try it out: a detached house whose electrical and network plan is already drawn. You plan the conduits from the utility room and the media enclosure in the hall to the rooms on both storeys.

Detached house 140 m² in 3D, seen from above at an angle, furnished

Detached house 140 m²

143.4 m² · 13 rooms

Installation zones after DIN 18015-3

Installation zones are strips in the wall where cables may run. Whoever later drives in a nail or drills a hole knows where to take care. The figures apply to walls inside rooms and are measured from the finished floor, the finished ceiling and the shell edge (DIN 18015-3:2016-09, guideline values).

ZonePositionRangePreferred
ZW-ohorizontal below the ceiling15 to 45 cm below30 cm
ZW-uhorizontal above the floor15 to 45 cm above30 cm
ZW-mhorizontal in rooms with worktops, such as kitchen and utility room100 to 130 cm above the floor115 cm
ZS-tvertical beside doors, on the lock side of single doors10 to 30 cm beside15 cm
ZS-fvertical beside windows10 to 30 cm beside15 cm
ZS-evertical beside wall corners10 to 30 cm beside15 cm

Since 2016 there are also zones for the outside of exterior walls: AZW-o and AZW-u 20 to 40 cm below the ceiling and above the floor, AZS-t and AZS-f 10 to 30 cm beside doors and windows, AZS-w 50 to 70 cm beside wall edges. At the ceiling a zone (ZD-r) is at most 30 cm wide and at least 20 cm away from the walls.

A few rules go with it:

  • In the wall, cables run only horizontally or vertically, never at a slant.
  • Switches usually sit at about 105 cm, sockets at about 30 cm above the finished floor.
  • If a box lies outside the zones, a socket above the worktop for instance, it gets a vertical stub from the nearest horizontal zone.

Conduit sizes

A conduit's size names its outer diameter in millimetres: M20 is 20 mm outside. Inside there is less, depending on the manufacturer.

SizeInside aboutTypical for
M1610.5 to 11 mma single thin cable
M2014 to 15 mm1 to 2 power cables NYM 3×1.5 or one data cable
M2518 to 19 mmtwo data cables, fibre or bus
M3224 to 25 mmPV direct current (2 strings), wallbox feed, riser
M4031 to 32 mmfrom distribution board to distribution board
M5039 to 40 mmmain runs with many cables

In the ground, cable protection pipes of DN 50 to DN 110 are common.

Fill, bends and pull boxes

  • Fill. The cables should fill at most about 40 % of the conduit's cross section. This is common practice and often attributed to DIN VDE 0100-520, a guideline value. The inner diameter should be at least 1.5 times the thickest cable.
  • Long runs. If a conduit has more than two bends or is longer than 15 m, take one size bigger.
  • Bend radius. At least about 6 times the outer diameter, so 150 mm for M25. The manufacturer's figures come first.
  • Pull boxes. At most two 90° bends between two boxes, and another pull box about every 15 m.
  • Pull wire. Put a pull wire into every conduit, even if it stays empty for now.

Keep power and data apart, pick the right type

Power and communication cables belong in separate conduits, and the direct current cables of a PV system get a conduit of their own as well. Light corrugated conduit (320 N) is not meant for concrete. In concrete and screed you need medium conduit with 750 N that the manufacturer approves for it. For the ground there are cable protection pipes, for outdoors UV-resistant conduit.

Prepare for PV, a wallbox and the garden

  • Photovoltaics. As a preparation, 1 to 2 conduits M32 for the direct current cables and 1 conduit M25 for data from the roof to the plant room are recommended.
  • Wallbox. For the feed an M32 is enough on short, straight runs, otherwise an M40. In Germany, whoever builds a new residential building with more than five parking spaces must equip every space with cable infrastructure under § 6 GEIG, such as protective conduits for later charging points. Check the current state of the law before you plan. More in the guide Conduits for PV and a wallbox.
  • Garden. For a garden socket pillar, lighting or a pump you lay cable protection pipes in the ground and lead them into the house through a building entry.

Common mistakes

  • Slanted cables. A cable running diagonally across the wall is what the drill hits later. Stay in the zones.
  • Conduits too small. A full conduit with three bends can hardly take another cable. Rather take one size bigger.
  • Power and data in one conduit. This can disturb the data cable. Plan separate conduits.
  • Light conduit in concrete. It can be crushed while the concrete is poured.
  • No pull wire. Without a pull wire an empty conduit is often useless later.
  • Slots in load-bearing walls. Whether and how deep you may cut a slot in a load-bearing wall is for the structural engineer to decide.

Frequently asked questions

May I plan and lay conduits myself?

You may plan them yourself, and a good plan makes the talk with the electrician easier. The electrical installation, however, belongs in the hands of a registered electrical contractor. So agree with them beforehand which conduits you prepare where. RoomPlanning is a planning aid, not a construction design.

What are installation zones?

Strips in the wall and at the ceiling where cables should run after DIN 18015-3: horizontally below the ceiling and above the floor, vertically beside doors, windows and corners. That way everyone knows where cables may lie in the wall.

How high do sockets and switches go?

Common are about 30 cm for sockets and about 105 cm for switches, measured from the finished floor. Above kitchen worktops, sockets usually sit in the middle zone around 115 cm.

Which conduit size do I need?

For one or two power cables NYM 3×1.5, M20 is usually enough, for two data cables M25, for PV, a wallbox or risers M32. With more than two bends or over 15 m, take one size bigger.

May I cut slots for conduits into load-bearing walls?

Ask the structural engineer. They decide whether and how deep a slot may be cut. RoomPlanning gives hints after DIN EN 1996-1-1/NA (tables NA.19 and NA.20) once you set the walls' structure and whether they are load-bearing (Installation zones); they do not replace the release.

Does RoomPlanning suggest the conduit size?

Yes. Enter the cables in a conduit with their count, RoomPlanning then shows the fill, and Suggest size proposes a fitting size. This is a guideline value; your electrician makes the decision.

Sources

All figures are guideline values from freely available sources, based on German rules, and do not replace a design by a registered electrical contractor. Clarify slots and openings in load-bearing parts with the structural engineer.