Plan gas pipes – as a sketch in 2D and 3D

Last updated: 16 November 2026

Try it right away

Free in the browser; try it without an account. To save, export and share, create a free account.
Start a floor plan

In RoomPlanning you sketch gas pipes starting at the house connection: house entry with main shut-off device, meter, then the yellow pipes at their height through the basement, walls and storeys up to the shut-off valve with thermal cut-off in front of every gas appliance. In 3D the X-ray view shows the pipes through walls and slabs. That gives you a clear basis for talking to the installer, the network operator and the chimney sweep.

Planning as a sketch – installation only by registered professionals (NDAV § 13). In Germany, apart from the network operator, only installation companies listed in a network operator's register of installers may work on a gas installation. RoomPlanning does not size pipes and approves nothing. All figures here and in the editor are guideline values for orientation, not an engineering design.

How to sketch gas pipes in RoomPlanning

  1. House connection and appliances first. Draw the service room or the connection wall, the kitchen and the plant room. From the catalog place house entry, gas meter, gas socket, gas cooker, hob, gas dryer and flue connection (Furnishing).
  2. Add a gas network. Under Building services pick the Gas pipe tool. In the Gas networks panel on the right, create the networks with Add standard networks, or choose Natural gas low pressure or Natural gas medium pressure with regulator under Add network, depending on how your network operator supplies gas.
  3. Place a riser. A Gas riser takes the pipe vertically through several storeys, for example from the basement to the kitchen on the ground floor (Levels).
  4. Draw the pipes. Click your way from the meter to the appliance. Set Routing and Height above floor in the Gas pipe panel, the Material on the network or on a single pipe. Only materials common for gas are offered; PE only in the ground.
  5. Add fittings. Under Fittings you insert the shut-off valve with thermal cut-off, main shut-off device, insulating joint, gas pressure regulator, gas flow limiter, gas socket and other fittings at the right spot on the pipe.
  6. Read the hints. Under Hints RoomPlanning tells you, for example, that the shut-off valve with thermal cut-off is missing in front of a gas appliance. Insert adds it to the pipe.
  7. Check in 3D and print. In the 3D view, switch Building services to X-ray. Every print and PDF with gas pipes carries the note that it is a sketch and not an installation design.
The plant room in the basement in 3D with X-ray: the yellow gas pipe runs from the house entry via the gas meter to the boiler, next to the water station, the hot water tank and the cold water pipes.
House entry, gas meter and boiler in the plant room of the Detached house with building services template.

The step-by-step guide is in the help under Draw gas pipes.

To try it out: a family house with kitchen and utility room, where you run the pipe from the meter to the cooker.

Family house with two floors in 3D, seen from above at an angle, furnished

Family house with two floors

159.7 m² · 11 rooms

How a gas installation in a house is built

This is the typical layout of a natural gas installation in a detached house, in the direction of flow. The details are set by the technical connection conditions (TAB Gas) of your network operator.

  1. Service pipe of the network operator, usually PE and in the ground. It belongs to the network operator.
  2. House entry, often a multi-utility entry together with power, water and telecoms, with an insulating joint that separates the pipe electrically from the network.
  3. Main shut-off device (HAE), easy to reach near the entry. The house connection ends here; the customer is responsible for everything behind it, except the network operator's pressure regulator and meter.
  4. Gas pressure regulator, if the network supplies medium pressure (above 100 mbar up to 1 bar). In a low-pressure network there is none.
  5. Gas flow limiter (GS) at the start of the installation. It shuts off when too much gas flows, for example when a pipe is torn off.
  6. Gas meter with a shut-off in front of it, in a detached house usually a G4 diaphragm meter.
  7. Pipes to the appliances, in rooms with fire protection requirements in a version with higher thermal resistance (HTB).
  8. Appliance shut-off valve with thermal cut-off (TAE) in front of every appliance. The thermal cut-off closes the gas supply by itself in a fire (BayFeuV § 4 (5)).
  9. Gas appliance, connected rigidly or detachably via gas socket and safety gas hose, typical for a cooker.

The gas pipe is also part of the house's protective equipotential bonding. That is an interface with the electrical plan.

Where the house connection goes

According to DIN 18012, a connection wall or niche is enough for up to about five dwellings; some network operators draw the line at four. Above that you need a service room of its own, as a guideline at least 1.80 × 2.00 m and 2.00 m high, with 1.20 m of free operating space in front of the equipment and not used as a passage. In apartment buildings the gas house connection does not belong in rooms open to everyone. The TAB Gas of your network operator always take precedence.

Guideline values for pressure, meter and consumption

QuantityGuideline for natural gas
Pressure in the house (low)about 20 to 23 mbar
Medium pressure before regulatorabove 100 mbar up to 1 bar
Calorific valueabout 10 kWh/m³ (H gas), 8 to 9 kWh/m³ (L gas)
G4 meterup to 6 m³/h, about 330 × 250 × 165 mm (H × W × D)
Larger metersG6 up to 10 m³/h, G10 up to 16 m³/h
Consumption of a 20 kW boilerabout 2 m³/h (nominal load in kW divided by calorific value)

The meter dimensions come from the datasheet of a common G4 meter; which meter you get is up to the network operator.

Colour and materials

Gas pipes are marked yellow according to DIN 2403, and that is how RoomPlanning draws them. These materials are common for gas (guideline values; the approved system is what counts):

MaterialJointTypical use
Steel pipethread, welding, press fittingsbasement, surface-mounted
Copper pipebrazing, press fittings with HTBdistribution in the house
Stainless steel pipepress fittings for gas, marked yellowdistribution, new build
Multilayer composite (gas)press fittings, DVGW-certified systemnew build, concealed, in screed
Corrugated stainless steelcompression fittingsappliance connection, renovation
PEweldingonly in the ground
  • Sizing. In a detached house pipes from DN 15 to DN 32 are common. The installer sizes them according to the TRGI from pressure loss and simultaneity. RoomPlanning does not size pipes.
  • Forbidden routes. Gas pipes do not belong in chimneys, flue, ventilation or lift shafts. Penetrations of walls and slabs with fire protection requirements follow the German guideline on building services installations (MLAR).
  • Heights in the plan. Unlike electrical cables, gas pipes have no fixed installation zones. That is why RoomPlanning records the height of every pipe; later you know where not to drill.

Gas appliances by type of flue

TypeDescriptionExampleTypical nominal load
Ano flue, combustion products into the roomgas cooker, hobcooker with 4 burners 7 to 10 kW
Bopen-flued, takes air from the roomolder boiler, instantaneous water heaterwater heater 18 to 24 kW
Croom-sealed, balanced fluecondensing boiler, closed gas fireboiler 15 to 25 kW

Type B appliances take their combustion air from the room. As a guideline, up to 35 kW they need a room with a window or door to the outside and at least 4 m³ of room volume per kW, a combustion air link with other rooms, or an opening to the outside (BayFeuV § 3). Fireplaces are generally not allowed in stairwells, required corridors and garages (§ 4). Before a fireplace is used for the first time, the district chimney sweep checks the flue. Combustion rules are state law in Germany and differ in details between states.

Flues, combustion air and lists

Waves 2 and 3 add what belongs around the gas pipe:

  • Flues: with the Flue tool you draw the connection from the appliance to the shaft or chimney. The flue rises through every storey and the roof; RoomPlanning sets the outlet height by the guideline of the German combustion regulations (§ 9: 40 cm above the ridge or 1 m above the roof surface, room-sealed appliances up to 50 kW with a fan 40 cm). Ending in an outside wall makes it a wall outlet. You see it in 2D, in 3D, in sections and facades.
  • Combustion air: for every room with a gas appliance RoomPlanning shows the room volume, the connected load and the guideline: 4 m³ per kW for open-flued appliances, an air network through doors with vent grilles or a vent to the outside of 150 cm², for a gas cooker over 15 m³. The check is free, like every safety hint; for a single room the combustion air calculator works it out too, and the guide room and combustion air explains the rules.
  • Liquefied gas (LPG) as a network of its own at 50 mbar, with the hint for rooms more than 1 m below the terrain.
  • Gas installation plan per storey to print, with legend, the stamp "Sketch – not a construction design" and the safety notice; DXF with gas layers of its own; gas pipes in wall views with their heights.
  • Material list and connection values (Premium): metres per material and size with allowance, bends, tees, fittings, wall and slab penetrations, pipe clips, appliances with kW, flues, flow and a meter suggestion, as CSV and to print.
  • Line suggestion (Premium): from the meter at right angles along the walls to the appliance, not through doors, windows and shafts.

RoomPlanning will not size pipes or approve an installation. That remains the job of the installer and the district chimney sweep.

If you smell gas

  • Do not use switches, doorbells or phones in the house, and no open flames.
  • Open windows and doors, close the main shut-off device.
  • Leave the house and warn everyone in it.
  • Call the network operator's emergency service from outside. The number is on the meter or on your bill. If there is danger, call 112.

Gas heating and the heating law

On 10 July 2026 the German Bundestag passed the Building Modernisation Act (GModG), which replaces the Building Energy Act (GEG). It changes the requirements when replacing a heating system; specialist reports name the end of the 65 % rule and rising mandatory shares of climate-friendly fuels from 2029. Constitutional complaints against the law have been announced. RoomPlanning makes no statement on whether a gas heating system is allowed in your case. What applies to your house is best clarified with an energy consultant.

Frequently asked questions

May I install a gas pipe myself?

No. In Germany, apart from the network operator, only installation companies listed in a network operator's register of installers may work on a gas installation behind the main shut-off device (NDAV § 13 (2)). You may plan and sketch it yourself, and a good sketch makes the talk with the installer easier.

What colour are gas pipes?

Yellow. DIN 2403 sets the marking colour for fuel gases. That is why RoomPlanning draws gas pipes in yellow, in 2D and in 3D.

What is a thermal cut-off (TAE)?

A thermally activated shut-off device. It usually sits in the appliance shut-off valve in front of every gas appliance and closes the gas by itself in a fire. Every gas outlet needs such a device (BayFeuV § 4 (5)). If it is missing in your sketch, RoomPlanning tells you under Hints.

Which gas meter does a detached house get?

Usually a G4 diaphragm meter that measures up to 6 m³/h. For a higher demand the network operator fits a G6 or G10. Meter and pressure regulator belong to the network operator, who also decides on the size.

Does RoomPlanning calculate pipe diameters?

No. The installer sizes the pipes from pressure loss and simultaneity using the methods of the TRGI. RoomPlanning shows route, height, material and fittings as a sketch.

Can I plan LPG as well?

Yes. Besides natural gas low pressure and medium pressure with regulator there is the network Liquefied gas 50 mbar; the material list also gives the consumption in kg/h. Good to know: LPG is heavier than air and collects at the floor, so stricter rules apply in basements, for example.

How often should a gas pipe be checked?

The installer tests a new pipe for strength and tightness before it goes into service. For existing pipes, experts recommend a visual check and a serviceability test about every 12 years; that is a guideline, not a fixed duty. If the leak rate is too high, the pipe has to be sealed or taken out of service at once.

Sources

All figures are guideline values from freely available sources, without guarantee. They do not replace planning or installation by a registered installation company.