Retrofitting underfloor heating: build-up heights in old buildings
Last updated: 16 November 2026
Try it right away
Free in the browser; try it without an account. To save, export and share, create a free account.Underfloor heating can be retrofitted in an old building in three ways: thin-layer systems on the existing screed need about 1.5 to 3 cm, dry systems with heat spreaders and dry screed about 6 to 9 cm, a wet heated screed with insulation 12 cm and more. As the slab, windows and doors are already fixed, the floor rises by the difference between the new and the old build-up, and the rooms get lower by exactly that much. All numbers here are guideline values after German practice; for dry and thin-layer systems the manufacturer's data apply.
How much height you keep is worked out by the floor build-up calculator.
The three kinds
| Kind | Build-up (example) | Height | Ready for covering |
|---|---|---|---|
| Thin layer on the old screed | Covering 10, thin-layer heating with compound 15 on the old screed | from 2.5 cm | after about 7 days |
| Dry system | Vinyl 10, gypsum fibre 25, system board with heat spreader 30, fill 20 | about 8.5 cm | at once |
| Heated screed (wet) | Parquet 15, heated screed 65, system board 30, insulation 30 | about 14 cm | after weeks |
- Thin layer. Pipes of about 10 mm in a stud panel or levelling compound, directly on the sound old screed or on tiles. Examples: Uponor Minitec with about 15 mm, Schlüter Bekotec with 8 to 25 mm of screed over the studs. The old screed stays as an existing layer.
- Dry. System boards of 25 to 30 mm with heat spreaders, on top gypsum fibre dry screed (about 18 to 25 mm, with a backing up to 33 mm). No water, little weight and ready at once, so the standard on timber joist floors.
- Wet. A heated screed needs at least 45 mm of cement screed (calcium sulphate 40 mm) over the pipe, about 60 to 65 mm in all, plus insulation. It weighs about 140 kg/m² and has to dry: as a rule of thumb about a week per centimetre up to 4 cm, much longer beyond.
An example from an old building
An apartment on timber joist floors has 24 mm boards today and 2.95 m clear height. The boards come out, the 85 mm dry build-up goes in, the structure stays:
- The floor rises by 61 mm (85 mm new less 24 mm removed).
- The clear height drops from 2.95 m to 2.89 m.
- The living room window's sill drops from 0.86 m to 0.80 m above the floor. Where the fall outside is more than 1 m, check the fall protection under your building code.
- A door's clear passage drops from 2.05 m to 1.99 m; door leaves are shortened or frames reset.
- If the bathroom keeps its old tiled build-up, there is a threshold. Barrier-free means at most 2 cm, and only where unavoidable.
- At the stair the first or last riser gets 61 mm lower.
If the old structural floor is uneven, a levelling layer takes it up. If it lies 25 mm too low at its deepest point and 5 mm too high at its highest, a fill of 20 mm nominal thickness is 15 to 45 mm thick at those points; the quantity counts the mean of 30 mm.
What to watch
- Load. On timber joist floors dry build-ups are the norm. A wet screed brings about 140 kg/m² and a lot of moisture into the house; a structural engineer has to check that.
- Insulation. If you renew a floor towards soil, outside air or unheated rooms, the German Building Energy Act asks for a U-value of at most 0.50 W/(m²K) for that element. Where the insulation thickness is limited, the greatest possible thickness with λ ≤ 0.035 is enough. The act continues as the Building Modernisation Act (GModG); check the version in force with your energy consultant.
- Capture what is there. Measure today's clear height, look under a threshold for the existing covering and screed, and find out how the floor is built before you choose a system.
Planning a retrofit with RoomPlanning
In RoomPlanning Capture existing floor records today's clear height, the kind of slab and the existing floor. Then you choose the new build-up with Structure stays: the app shows beforehand how far the floor rises, which windows and doors are affected and which rooms fall below 2.40 m. On timber joists it offers the dry build-ups first. More on the page Plan the floor build-up. The apartment from the example:

Refurbished period apartment
88 m² · 6 rooms
Frequently asked questions
How much build-up height does retrofitted underfloor heating need?
Thin-layer systems on an existing screed about 1.5 to 3 cm, dry systems about 6 to 9 cm, a wet heated screed with insulation 12 cm and more.
Can I lay underfloor heating on tiles?
Thin-layer systems are made for it if the base is sound and even. The manufacturer's system approval decides.
Which underfloor heating suits a timber joist floor?
Usually a dry system: no water, little weight, ready at once. A wet screed on timber joists only makes sense after a structural engineer has checked it.
What happens to the doors when the floor gets higher?
The clear passage drops by as much as the floor rises. Below about 2.00 m door leaves are shortened or frames set higher.
Sources
Read on 15 November 2026 (in German). For dry and thin-layer systems the manufacturer's data apply, not the tables of DIN 18560.
- Low build-up, high efficiency: Uponor Minitec – haustechnikdialog
- Bekotec planner information (PDF) – Schlüter-Systems
- Brio 23 dry screed – Knauf
- Heated screed construction – Baunetz Wissen
- Estrich (screed) – Wikipedia
- GEG Annex 7 – Gesetze im Internet
- GEG and Building Modernisation Act – co2online
This guide is general information with guideline values and does not replace planning by a heating engineer, structural engineer or energy consultant.