Planning the floor build-up: finished floor, structural floor and room height
Last updated: 16 November 2026
Try it right away
Free in the browser; try it without an account. To save, export and share, create a free account.The floor build-up is everything between the structural floor (SFL), the top of the slab, and the finished floor level (FFL): levelling, insulation, impact sound insulation, underfloor heating, screed and covering. In a German new build with underfloor heating that is about 14 cm, on a ground slab about 19.5 cm, without heating about 11 cm. Clear room height, window sills, door heights and stair risers are measured from the FFL. All numbers here are guideline values for early planning, after German practice; other countries have their own rules.
For your room the floor build-up calculator works out the clear height, the sill above the FFL and the clear door height.
The terms
| Term | Meaning |
|---|---|
| FFL (German OKFF) | Finished floor level. ±0.00 is usually the ground floor's FFL. |
| SFL (German RFB) | Structural floor: top of the slab or ground slab. What the bricklayer and shell work to. |
| Floor build-up | All layers between SFL and FFL. |
| Clear room height | From the FFL to the underside of the finished ceiling (plaster or suspended ceiling). |
| Storey height | From FFL to FFL. With equal build-ups the same as from SFL to SFL. |
How the heights fit together
Storey height = clear height + ceiling finish + slab + floor build-up above.
An example for a new build: 2.50 m clear height, 1 cm plaster on the ceiling, a 20 cm slab and 14 cm build-up on the upper floor give a storey height of 2.85 m. If you know the shell height, from the SFL to the underside of the slab above, work the other way round: shell height less build-up less ceiling finish is the clear room height.
Usual build-ups
Thicknesses from top to bottom, guideline values.
| Build-up | Layers | Total |
|---|---|---|
| New build with underfloor heating | Parquet 15, heated screed 65, heating system board 30, EPS insulation 30 | 140 mm |
| New build without underfloor heating | Parquet 15, cement screed 45, impact sound EPS-T 20, EPS insulation 30 | 110 mm |
| On the ground slab with heating | Tiles 15, heated screed 65, system board 30, insulation 2 × 40, membrane 5 | 195 mm |
| Dry retrofit with underfloor heating | Vinyl 10, gypsum fibre dry screed 25, dry heating system 30, levelling 20 | 85 mm |
| Thin retrofit on the existing screed | Covering 10, thin-layer heating 15 on the old screed | 25 mm new |
| Unheated basement | Coating 2, bonded screed 40 | 42 mm |
The 65 mm of heated screed are a 16 mm pipe, 45 mm of cement screed over it (DIN 18560-2) and some tolerance. Calcium sulphate flowing screed needs 40 mm over the pipe, unheated about 35 mm. Cement screed weighs about 2.0 to 2.2 kg/m² per millimetre, so 65 mm of heated screed about 140 kg/m².
Sills, doors and stairs from the finished floor
- Window sill. It counts from the FFL. Depending on the German state, 0.80 to 0.90 m are usual as fall protection, more with a large fall height. In the shell the window opening lies higher by the build-up: 0.90 m above the FFL is 1.04 m above the SFL with a 14 cm build-up.
- Doors. The German rough opening sizes (DIN 18100), such as 885 × 2,010 mm, count in height from the FFL. The rough opening reaches down to the SFL and is higher there by the build-up.
- Stairs. The rise counts from FFL to FFL. For a solid stair cast in the shell the build-ups at top and bottom must be fixed beforehand, or the first or last riser ends up too high or too low.
- Thresholds. If a room has a thicker build-up than the hall, such as a tiled bathroom, there is a step. Barrier-free means at most 2 cm, and only where unavoidable (DIN 18040).
Planning the floor build-up with RoomPlanning
In RoomPlanning you choose one of six standard build-ups in the Levels panel or make your own. The app shows FFL, SFL, storey height and clear height, the layers hatched in the section, and every window's sill above the FFL and above the shell. More on the page Plan the floor build-up. A refurbished period apartment with a dry build-up, its own build-up in the bathroom and a suspended ceiling:

Refurbished period apartment
88 m² · 6 rooms
Frequently asked questions
What is the difference between FFL and SFL?
The FFL is the top of the finished floor you walk on. The SFL is the top of the slab below. The distance between the two is the floor build-up.
How thick is a floor build-up in a new build?
Without underfloor heating about 11 cm, with heated screed about 14 cm. On a ground slab more insulation comes in, then it is more like 18 to 20 cm.
Is the room height measured from the structural floor?
No. The clear room height counts from the FFL to the underside of the finished ceiling. The shell is measured from the structural floor.
What clear room height is required?
The German model building code (§ 47 MBO) names 2.40 m for habitable rooms and 2.20 m over half the area for attic rooms. It does not apply there to residential buildings of classes 1 and 2; the state code decides.
Where is the window sill measured from?
From the FFL. Window fitters and the shell work with the height above the structural floor, which is larger by the build-up.
Sources
Read on 15 November 2026. Standards such as DIN 18560, DIN 18065, DIN 18040 and DIN 18100 are paid; the numbers come from freely available secondary sources (in German).
- Estrich (screed) – Wikipedia
- Heated screed construction – Baunetz Wissen
- Door leaf sizes after DIN 18101 – Baunetz Wissen
- Which doors must be threshold-free? (PDF) – Kreis Soest
- Dynamic stiffness – Baunetz Wissen
This guide is general information with guideline values and does not replace planning by an architect, structural engineer or contractor.