Plan water and drains
Step by step on the detached house: add pipe networks, place risers through the storeys, draw pipes with height and slope, read the hints and see the pipes in 3D.With the building services you plan cold and hot water, circulation, waste water and rain water: where the pipes run, at which height, with which slope and on which riser. This guide shows it on the Detached house 140 m² without building services (the template in the gallery has them drawn in already): you place a waste stack and a cold water riser in the shower room and connect the washbasin and the shower. It takes about ten minutes.
Open the template in the editor1. Open the template
Open the Detached house 140 m² without building services with the button above. On the ground floor the utility room and the shower room with washbasin, toilet and shower lie side by side. Without an account your plan stays in this browser; with a free account it is ready on every device.

2. The connections of the fixtures
Washbasin, toilet, shower, bath, sink, washing machine and the building services in the catalog bring their connections: cold and hot water and the drain, each at the usual height. With Select (V), click the washbasin in the shower room. Under Connections on the right, every connection is listed with its height and its state open or connected, for example "PWC at 550 mm: open".

- Select the washbasin
- Its connections
3. The Pipe tool and the pipe networks
The tools are in the left bar under Building services. Choose Pipe or press I. In the Pipe networks section on the right, Add standard networks creates cold drinking water (PWC), hot drinking water (PWH) and waste water (SW). Further networks such as circulation (PWH-C), rain water (RW), vent or heating are under Add network below. Every network has a medium, a colour following the usual plan colours and a name you can change in its field.

- Pipe, or key I
- The pipe networks
- Add standard networks
| Abbreviation | Medium | Colour |
|---|---|---|
| PWC | Cold drinking water | Green |
| PWH | Hot drinking water | Red |
| PWH-C | Circulation | Violet, dashed |
| SW | Waste water | Brown, dashed |
| RW | Rain water | Blue, dashed |
4. Place the risers
A riser is a vertical pipe through several storeys, like the stack in a shaft. Choose Riser (Y), the Network waste water (SW) on the right, and click on the plan where the riser stands, here in the corner of the shower room by the wall to the utility room. Place a riser for cold drinking water (PWC) beside it the same way.
A click on a riser with Select shows on the right which storeys it runs between: From level and To level, each with its height above the floor. For waste water Vent above roof is on: the stack continues as a vent above the roof.

- The waste stack
- Network of the riser
- From level, to level
5. Draw the pipes
Choose Pipe (I) again and the Network on the right. The connections of that network show on the plan as coloured dots. Click a connection, add corners with a click and end at the riser or at another pipe of the same network. There the pipe snaps in and adds the vertical runs itself. Enter or a double click ends the pipe, A bows the next run into an arc.
In the example a cold water pipe (PWC) runs from the riser to the washbasin, and a second one branches off it to the shower. Then you choose waste water (SW) and draw the drains of washbasin and shower to the stack.
Under Routing you choose where the pipe lies: Exposed, In the wall / frame, In the floor (screed), In the slab, Under the ceiling, Suspended ceiling, In a shaft, In the ground, On the roof or Outside on the facade. Every network brings a fitting routing, waste water the screed for example. The routing sets the Height above floor, which you can change. For waste water you choose the Slope (0.5 %, 1 % or 2 %); the pipe then falls in the direction you draw. So draw waste pipes from the fixture to the riser.

- Choose the network
- Routing
- Slope for waste water
- Cold water and waste pipes
6. Edit a pipe
A click on a pipe with Select selects it. At the top on the right you see its length, its content in litres and the number of runs. You need the content for the 3-litre rule for hot water. Below it you change Network, Routing, Diameter (automatic or fixed), the Height at the start and the Height at the end and, for waste water, the Slope.

- Length and content
- Diameter
- Height at the start and at the end
- Selected pipe
7. Read the hints
Below the Pipe networks, RoomPlanning checks your plan against guideline values in the Hints section. Every hint names its source, for example:
- a connection no pipe ends at yet, as here at the toilet and the hot water;
- more than 3 litres of hot water up to a tap without circulation;
- too little slope or a back slope on waste pipes;
- a drain below the backwater level without a lifting unit or backwater valve;
- a pipe in the ground that is not deep enough to be frost-free.
A click on a hint selects the spot and brings it to the middle of the plan. Hints block nothing; they are prompts for the talk with your installer.

- Hints with their source
8. Settings for water and drains
Below that, open the Water and drains section. There you set the backwater level: switched on, the terrain at the house counts; switched off, you enter a height of your own. Your municipality tells you the backwater level. Further settings are the Supply pressure (bar), the design rainfall for your location, the Building use and the Waste allowance in percent.

- Backwater level
- Building use
9. See the pipes in 3D
Switch to the 3D view at the top. Under Building services on the right you choose Off, Visible (only exposed pipes) or X-ray: then you see every pipe with its diameter, those in walls and floors and the risers through the slabs too. With the walls on Cut and Walls towards the camera see-through the view is clear.

- Building services: Off, Visible, X-ray
10. Guideline sizes, material list and riser diagram (Premium)
With Premium RoomPlanning shows what the pipes roughly need. With the Pipe tool the area Water and drainage report sits on the right:
- Guideline sizes: for every pipe and riser RoomPlanning works out a size, drinking water from the loading units (LU) of the taps, waste water from the discharge units (ΣDU), rain water from the roof area per downpipe. A pipe's properties then say, for example, Guideline 20×2 · ΣLU 5 · 0.4 l/s, with a note when a pipe is set smaller by hand. Apply guideline sizes writes them into all pipes on “Automatic”, for 3D and the material list.
- Material list: pipes per material and size with allowance, bends, tees, wall plate elbows, angle and appliance valves, insulation, pipe clamps, cleanouts, vent caps and the connected objects. Filter it by network and storey and download it as CSV for your quote (opens in Excel and LibreOffice with umlauts).
- Riser diagram drinking water and Riser diagram drainage: storeys with their heights, every riser as a column, the objects it serves per storey and the load of each section; for drains the backwater level and the ground pipe.
- Longitudinal section ground pipe: the ground pipe from the foot of the stack to the outlet with inverts, slope, nominal size and lengths, the ground above and the backwater level.
You also find the drawings under Drawings in the section Building services. In a wall view the switch Pipes and connections shows the installation wall with every connection height in millimetres and the axis distances, the print for the installer. On sheets you add riser diagram, section and material list with Add; Sheet “Drainage application” creates an A3 sheet with site plan, floor plan, riser diagram, section and legend. Your municipality tells you what your application needs exactly. With a riser diagram selected on a sheet, Move branches moves each riser left or right with the arrows; this applies to that sheet only, and Arrange automatically resets it. Sections show the risers beyond the section plane, cut pipes as circles and pipes just beyond it as lines; facades show vents over the roof, pipes outside the house and, dashed, pipes in outer walls.
Print plumbing plan prints the storey's water and drain plan with its legend, also without Premium.
11. Connect a bathroom automatically
Select a room or an object and press Connect water and drainage on the right. RoomPlanning runs the pipes along the walls to the nearest riser, cold water below hot, waste water with a slope. Without a riser it sets one at the nearest wall through all storeys. Afterwards you edit everything freely; Undo takes the whole proposal back. Without Premium you can try it once per plan.
The guideline values come from freely available sources (DIN EN 806-3, DIN 1988-300, DIN EN 12056-2, DIN 1986-100) and are not engineering: sizing and installation are done by a registered plumbing contractor (§ 12 AVBWasserV).
Good to know
- Pipes lie on the Plumbing layer. You show and hide it under Layers.
- Pipes belong to the storey you draw them on. Risers connect them between storeys (Levels).
- When you move a fixture, connected pipe ends follow.
More guideline values for connection heights, slope and backflow are in Plan plumbing and water pipes. Gas pipes are covered in Draw gas pipes, conduits in Plan conduits.